Rack PDU 2G, Metered, ZeroU, 11kW, 230V, (36) C13 & (6) C19 w/1.8M input power cord with IEC309 16A 3 phase input connector
**16A/20A Three-phase input power is required
|
|||||||||||||||||||||||||||||||
HP DL560 Gen9 Secondary 3 Slot Riser Kit (793474-B21)
HPE DL20 Gen9 Smart Storage Bat Holder (822451-B21)
APC Metered Rack PDU (AP7820)
Rack PDU 2G, Metered, ZeroU, 11kW, 230V, (36) C13 & (6) C19 w/1.8M input power cord with IEC309 16A 3 phase input connector
**16A/20A Three-phase input power is required
|
|||||||||||||||||||||||||||||||